Marina Bonaire
The Marina de Bonaire, also called Puerto del Cocodrilo, was designed and executed during the 1970s in the bay of Pollensa (Mallorca). The powerful storm in November 2001 destroyed the outer dam and caused significant damage to its port facilities, which have 333 moorings with lengths between 6 and 15 m.
TP&E designed and directed the reform and reinforcement works for the 428-m outer damm. The works also included the preparation of a skylight pier on the outer dock, a reflection heel for the waves and the preparation of the dry dock for its adaptation to the Balearic Government Port Law.

